ASSEMBLE ROBOT
Build
After receiving many of our parts, we finally started build. After staying for very late nights, we have many of our subsystems built in about 3 days! Our bot is almost built and will move on to electrical and programming soon.
Week 5: 2/8/25
BUMPER UPGRADE
Design
In response to the creation and positioning of the climber on the Chassis, Design Members and Mentors created a New Bumper that works with our current design.
Week 5: 2/8/25
FABRICATION
Design
The Design team started getting parts sent out to be CNCed.
Week 5: 2/8/25
PROGRAMMING LEAD AND "CONSULT"
Programming
The Programming team reviewed feasibility of prototypes through a programming lens.
Week 5: 2/3/25
BUILDING FIELD ELEMENTS
Build
The Build team started working on the field element called the reef. Build students have been reviewing drawings and putting assembly skills to use.
Week 5: 2/3/25
SWERVE MODULE ASSEMBLY
Build
The Build team began assembling new X2t swerve modules from WCP.
Week 4: 2/1/25
DESIGNED THE CLIMBER
Design
The Design team used OnShape to design a climber for our robot to climb the deep cage, with some failed concepts.
Week 2: 1/18/25
CALL CENTER
Marketing
Students across the team worked together to find companies that may want to support our team.
Week 2: 1/18/25
BLOCK CAD
Design
Mastersketch and block cadded robot archetype.
Week 2: 1/13/25
PROTOTYPING ROBOT DESIGNS
Build
Week 1: 1/5/25
PUGH ANALYSIS
Build
PUGH Analysis on robot prototyping.
Week 1: 1/5/25
KICKOFF
Whole Team
Game Reveal Kickoff for FRC Reefscape..
Week 2: 1/4/25